project Info
Drylining, plastering and insulation.
Number of Units: 6 townhouses in two phases
Timescale: September 2024 – January 2025
Cobblers Close, West Sussex
The Cobblers Close development is a carefully planned residential scheme that highlights the application of modern construction techniques to deliver high-quality homes. Located in a desirable setting, the project consists of six townhouses built over two distinct phases, ensuring that delivery is both manageable and efficient.
The scope of works at Cobblers Close includes drylining, plastering, and insulation, three critical elements in the construction process that directly influence the performance, comfort, and finish of the new homes. Each of these aspects has been approached with precision to ensure that the end product meets both client expectations and industry standards.
Drylining forms the backbone of the internal works. By installing plasterboard systems across walls and ceilings, the project team has created robust, level surfaces ready for further treatment. This stage ensures consistency across all properties, providing a durable structure that underpins the overall interior quality.
The inclusion of plastering within the scope ensures that every surface is brought to a smooth, refined finish. High-quality plastering not only enhances the appearance of the homes but also contributes to durability, creating a strong foundation for painting and decorative finishes. The professional plasterwork guarantees a seamless look across all six townhouses.
Insulation has also been a major focus at Cobblers Close. Thermal and acoustic insulation systems have been installed to improve energy efficiency, reduce heat loss, and enhance living comfort. By prioritising insulation, the project supports sustainable building practices while ensuring long-term benefits for future residents in terms of reduced energy bills and improved indoor climate.
The development comprises six townhouses, which have been delivered in two phases. This phased approach has allowed the project team to coordinate resources effectively, maintain consistent quality standards, and manage the programme efficiently. It also ensures that attention to detail is not compromised across the properties.
The construction timescale runs from September 2024 to January 2025, providing a clear four-month programme for delivery. This schedule reflects careful planning, with sufficient time allocated to complete the works to the highest standards while maintaining efficiency throughout.
Townhouses bring their own set of construction challenges, often requiring efficient use of space across multiple floors. At Cobblers Close, the internal works of drylining, plastering, and insulation have been carried out with these requirements in mind, ensuring that each home benefits from both functional layouts and refined finishes.